Xhevdet Doda Gymnasium
Status
Completed
Project Type
Public/Education
Project Area
4,500m²
Duration
1 Year

Project Description
The Xhevdet Doda Gymnasium, constructed in 2010, represents an important milestone in the development of educational infrastructure in the capital city, being the first educational facility built in Prishtina after more than 30 years. This strategic investment marked a major step toward modernizing secondary education conditions and improving capacity for future generations.
Implemented with funding from the Municipality of Prishtina in cooperation with the Ministry of Education, Science and Technology (MASHT), the facility was designed and constructed according to contemporary standards of architecture and functionality, ensuring a safe, naturally lit, and suitable environment for the learning process.
With a total area of 4,500 m² organized across three floors, the gymnasium offers 21 classrooms equipped in accordance with modern pedagogical requirements, 5 specialized cabinets, as well as various laboratories that enable the practical development of scientific and vocational subjects.
Completed within a one-year period, this project demonstrates professional capability, dedication, and rigorous adherence to planned deadlines, resulting in an educational institution that today serves as a model of modern school infrastructure in the country.
Key Details
- Location: Prishtinë
- Constructed Area: 4,500m²
- Investor: Prishtina Municipality and MEST
- Commencement Date: 2009
- End Date: 2010
